Monday May 5 |
Tuesday May 6 |
Wednesday May 7 |
Thursday May 8 |
Friday May 9 |
9:00 � 9:45 Welcome and
Introductions, including Safety Lecture |
8:30 � 9:30 Project Planning and Management within
a Lifecycle Mgmt Framework (P. Booth) |
8:30 � 9:30 Introduction to
Decommissioning | Safety
Requirement Document (L. Boing) |
8:30 � 9:30 Safety Assessment (D.
Draper) |
8:30 � 9:00 Overview of Dose and
Risk Assessment (C. Yu) |
9:45 � 10:45 (K. Smith and L. Boing) |
9:30 � 10:15 Determining End
States and Future Site Uses (M. MacDonell) |
9:30 � 10:30 Environment, Safety & Health Issues
(T. Hansen) |
9:30 � 10:30 Building Characterization
(T. Hansen) |
9:00 � 10:30 Dose and Risk Assessment for Building Contamination: RESRAD-BUILD (C. Yu and D. LePoire) |
BREAK |
BREAK |
BREAK |
BREAK |
BREAK |
11:00 �
11:30 IAEA Perspectives
on D&ER Barriers (P. Booth) |
10:30 � 11:15 (P. Booth and K. Smith) |
10:45 � 12:00 Cost Estimation and Contracting for
D&D Projects (J. Carignan) |
10:45 � 11:45 Decontamination Technologies (R. Demmer)
|
10:45 � 11:30 RESRAD-BUILD, cont. |
11:30 � 12:00 (L. Boing and L. Moos) |
11:15 � 11:45 (P. Booth) |
11:45 � 12:15 Case Study: Foundry Facility
D&D (T. Hansen) |
11:30 � 12:00 Dose and Risk Assessment for Soil Contamination: RESRAD and RESRAD Offsite |
|
LUNCH |
LUNCH |
LUNCH
|
LUNCH |
LUNCH |
1:00 � 3:00 Participants� Presentations |
12:45 � 1:15 Conceptual Site Models
(P. Booth)
|
1:00 � 1:45 Material Clearance (D. Draper) |
1:15 � 2:15 Dismantling Technologies
(L. Boing) |
1:00 � 3:00 RESRAD-BUILD and RESRAD hands-on exercises |
1:45 � 3:00 Waste Management (R. Shult) |
||||
1:15 � 2:45 Painful Site Conceptual Site Model, hands-on exercise
|
3:00 � 3:30 Records (D. Draper) |
2:15 � 3:00 Final Status Surveys (T. Hansen) |
||
BREAK |
BREAK |
BREAK |
BREAK |
BREAK |
3:15 � 5:00 Participants� Presentations, cont. |
3:00 � 3:45 Conceptual Site
Models, hands-on exercise, cont. |
3:45 � 5:00 D&D Planning hands-on exercises (L. Boing) |
3:15 � 5:00 D&D Cost
Estimation/Work Breakdown Structure hands-on exercises (L. Boing) |
3:15 � 5:00 RESRAD-BUILD and
RESRAD hands-on exercises, cont. |
3:45 � 5:00 Conceptual Site
Model Group Presentations to Stakeholders (P. Booth) |
||||
|
6:30 Group Dinner |
7:00 Seminar at Hotel: Case Study of Zion Nuclear Power
Plant Decommissioning (S. Horvath, Energy Solutions) |
|
|
Monday May 12 |
Tuesday May 13 |
Wednesday May 14 |
Thursday May 15 |
Friday May 16 |
8:30 � 9:25 Waste Disposal � Part
1 (V Rogers Jr) |
8:30 � 10:15 Introduction to Env.
Site Characterization; Env.
Data Collection Realities (B. Johnson) |
8:30 � 10:30 Surface Soils: Gamma
Walkover Surveys; Incremental
Soil Sampling Case Study (B. Johnson) |
8:30 � 11:30 Site Characterization Equipment Demonstrations and Exercise (B. Johnson and USEPA Region V) |
8:30 � 10:30 Participants Action Plan Presentations |
9:25 � 10:15 (L. Boing) |
||||
BREAK |
BREAK |
BREAK |
BREAK |
|
10:35 � 11:15 Waste Disposal �
Part 2 (V. Rogers) |
10:30 � 12:00 Measuring Radionuclides in the
Environment; Incremental Sampling
Strategies for Surface Soils (B. Johnson) |
10:45 � 11:30 Exercise in Developing a Characterization
Program (B. Johnson) |
10:45 � 12:45 Participants Action Plan Presentations |
|
11:15 � 12:00 Case Study: University of
Buffalo Research Reactor D&D (D. Miller) |
||||
LUNCH |
LUNCH |
LUNCH |
LUNCH |
LUNCH |
1:30 � 5:00 D&D Exercise and Visit to EPA Warehouse (L. Boing and USEPA Region V) � |
1:00 � 3:00 RESRAD OFFSITE hands-on exercise (C. Yu and D. LePoire) |
12:30 � 1:15 (L. Martino) |
1:00 � 1:45 (L. Martino) |
1:45 � 2:15 (L. Boing and P.
Booth) |
1:15 � 3:15 Updating the Conceptual
Site Model, hands-on exercise (small groups) (B. Johnson and P.
Booth) |
1:45: 2:30 (L. Martino) |
2:15 � 3:00 Closing Remarks |
||
2:30 � 3:00 Case Study: In Situ Groundwater
Treatment with Permeable Walls (L. Durham) |
||||
BREAK |
BREAK |
BREAK |
Optional
Tour of Advanced Photon Source and Nuclear Engineering Exhibit |
|
3:15 � 5:00 RESRAD OFFSITE hands-on
exercise, cont. |
3:30 � 5:00 Conceptual Site
Model Group Presentations to Stakeholders (B. Johnson and P.
Booth) |
3:15 � 3:45 Site Closure: Final Status Surveys and MARSSIM (L. Durham) |
||
3:45 � 5:00 Participants Prepare Action Plans |
||||
|
|
7:00 Seminar at
Hotel: IAEA Activities Related to Fukushima
(H. Monken Fernandes) |
Group Dinner |
|