Monday April 8 |
Tuesday April 9 |
Wednesday April 10 |
Thursday April
11 |
Friday April 12 |
9:00 � 9:45 Welcome and
Introductions, including Safety Lecture |
8:30 � 10:45 Setting Project Objectives, Project Planning, Decision Making, and Cost
Estimation | PM and CE(P. Booth and J. Carignan) |
8:30 � 9:00 Overview of Dose and Risk Assessment (C. Yu and D. LePoire) |
8:30 � 9:30 Introduction to Decommissioning�
(L. Boing) |
8:30 � 9:30 Safety Assessment (D. Draper) |
9:45 � 10:30 (Smith, Boing, Booth) |
9:00 � 10:30 Dose and Risk Assessment for Building Contamination: RESRAD-BUILD |
9:30 � 10:30 Environment, Safety & Health Issues (T. Hansen) |
9:30 � 10:30 Building Characterization (T. Hansen) |
|
BREAK |
BREAK |
BREAK |
BREAK |
BREAK |
10:45 �
11:00 Course Overview
& Objectives, cont. |
11:00 � 11:30 (P. Booth) |
10:45 � 11:30 RESRAD-BUILD, cont. |
10:45 � 11:45 Records (D. Draper) |
10:45 � 11:30 Decontamination Technologies (L. Boing) |
11:00 � 11:30 Study Site Presentation (K. Smith) |
11:30 � 12:00 (P. Booth) |
11:30 � 12:00 Dose and Risk Assessment for Soil Contamination: RESRAD and RESRAD
Offsite |
11:45 � 12:30 Material Clearance (D. Draper) |
11:30 � 12:15 Case Study: Foundry Facility D&D (T. Hansen) |
LUNCH |
LUNCH |
LUNCH |
LUNCH
|
LUNCH |
12:30 � 1:45 Argonne Case Study
and Site Tour (L. Boing and L. Moos) |
1:00 � 1:30 Conceptual Site Models
(P. Booth)
|
1:00 � 3:00 RESRAD-BUILD and RESRAD hands-on exercises |
1:30 � 2:30 Waste Management (Boing) |
1:15 � 2:15 Dismantling Technologies (L. Boing) |
1:45 � 3:00 Participants� Presentations |
1:30 � 2:45 Conceptual Site Models,
hands-on exercise (small groups)
|
2:30 � 3:00 Case Study: JANUS Reactor D&D (L. Boing) |
2:15 � 3:00 Final Status Surveys (T. Hansen) |
|
BREAK |
BREAK |
BREAK |
BREAK |
BREAK |
3:15 � 5:00 Participants� Presentations, cont. |
3:00 � 3:45 Conceptual Site
Models, hands-on exercise, cont. |
3:15 � 5:00 RESRAD-BUILD and
RESRAD hands-on exercises, cont. |
3:15 � 5:00 D&D Planning hands-on exercises (L. Boing) |
3:15 � 5:00 D&D Cost
Estimation/Work Breakdown Structure hands-on exercises (L. Boing) |
3:45 � 5:00 Conceptual Site
Model Group Presentations to Stakeholders (P. Booth) |
||||
|
|
6:30 Group Dinner |
7:00 Seminar at Hotel: IAEA Networks and |
|
Monday April 15 |
Tuesday April 16 |
Wednesday April 17 |
Thursday April 18 |
Friday April 19 |
8:30 � 9:25 Waste Disposal � How and Why (V Rogers Jr) |
8:30 � 10:15 Introduction to
Env. Site Characterization; Env. Data
Collection Realities (B. Johnson) |
8:30 � 10:15 Surface Soils:
Gamma Walkover Surveys; (B. Johnson) |
8:30 � 10:30 Updating the Conceptual Site Model, hands-on exercise (small groups) (B. Johnson and P. Booth) |
8:30 � 10:30 Participants Action Plan Presentations |
9:25 � 10:20 Evolving Technologies (F. Chambon) |
||||
BREAK |
BREAK |
BREAK |
BREAK |
BREAK |
10:35 � 11:30 French D&D Case Study (F. Chambon) |
10:30 � 12:00 Measuring Radionuclides in the Environment; (B. Johnson) |
10:30 � 11:15 (B. Johnson) |
10:45 � 12:00 Conceptual Site Model Group Presentations to Stakeholders (B. Johnson and P. Booth) |
10:45 � 12:45 Participants Action Plan Presentations |
11:30 � 12:15 D&D Videos (L. Boing) |
11:15 � 12:00 Exercise in Developing a Characterization Program (B. Johnson) |
|||
LUNCH |
LUNCH |
LUNCH |
LUNCH |
LUNCH |
1:00 � 5:00 D&D Exercise and Visit to EPA Warehouse (L. Boing and USEPA Region V) |
1:00 � 3:00 RESRAD OFFSITE hands-on exercises |
1:00 � 5:00 Site Characterization Equipment Demonstrations and Exercise (B. Johnson and USEPA Region V) |
12:45 � 1:15 Case Study: If Things Have the Potential to Go Wrong They Will (P. Booth) |
1:45 � 2:15 (L. Boing) |
1:15 � 2:00 Case Study: In Situ
and Ex Situ Soil Segregation (L. Durham) |
2:15 � 3:00 Closing Remarks |
|||
2:00 � 2:45 Case Study: In Situ
Groundwater Treatment with Permeable Walls (L. Durham) |
||||
BREAK |
BREAK |
Optional
Tour of Advanced Photon Source and Nuclear Engineering Exhibit |
||
3:15 � 5:00 Hands-on exercise
cont. |
3:00 � 3:45 Site Closure: Final
Status Surveys and MARSSIM (B. Johnson) |
|||
3:45 � 5:00 Participants Prepare Action Plans |
||||
|
|
7:00 Seminar at
Hotel: US Army Corps of
Engineers Reducing and Communicating Uncertainty in ER Projects
(D. Frothingham) |
Group Dinner |
|